News Center

Cood faith Reputation is heavy . The unity ofknowledge and Practice


10

2012

-

06

My company has added a Grade 3 qualification for the installation of electromechanical equipment and environmental protection engineering.


I. Grade 3 professional contracting of electromechanical equipment installation engineering can undertake the installation of equipment, lines, and pipelines for general industrial and public/civil construction projects with an investment of 8 million yuan or less, and the fabrication and installation of non-standard steel components. II. Grade 3 professional contracting of environmental protection engineering can undertake the construction of the following projects with a single contract amount not exceeding 5 times the registered capital of the enterprise: 1. Poultry and livestock manure biogas projects with a single pool volume of 300 cubic meters or less; anaerobic biochemical treatment projects with a single pool volume of 400 cubic meters or less; 2. Coal-fired power plant flue gas desulfurization projects with a single unit capacity of 200,000 kW or less; industrial projects of 20 tons or less

 My company has added Class III qualifications for the installation of electromechanical equipment and environmental protection projects.

I. Class III professional contracting of electromechanical equipment installation engineering can undertake the installation of equipment, lines, and pipelines for general industrial and public/civil construction projects with an investment of 8 million yuan or less, and the fabrication and installation of non-standard steel components.
II. Class III professional contracting of environmental protection engineering can undertake the construction of the following projects with a single contract amount not exceeding 5 times the registered capital of the enterprise:
1. Livestock and poultry manure biogas projects with a single pool volume of 300 cubic meters or less; anaerobic biochemical treatment projects with a single pool volume of 400 cubic meters or less;
2. Flue gas desulfurization projects for thermal power units with a single unit capacity of 200,000 kW or less; flue gas desulfurization projects for industrial and central heating coal-fired boilers of 20 tons or less;
3. Comprehensive treatment projects for noise, harmful gases, dust, wastewater, and industrial waste from small industrial projects;
4. Medical wastewater treatment projects for Class A and below hospitals.
Approved by the Yangzhou Municipal Bureau of Urban and Rural Construction, on September 21, 2012, our company successfully obtained Class III qualifications for electromechanical equipment installation engineering and environmental protection engineering. The acquisition of these qualifications has brought our company's qualification level and business capabilities to a new level.