My company has added electrical and mechanical equipment installation and environmental engineering contractor three qualificati
Page view
[Abstract]:
First, the mechanical and electrical equipment installation engineering contracting three can take 8 million yuan investment and the following general industrial and public, civil construction projects equipment, lines, pipelines, non-standard steel components of the production, installation.
Second, the environmental engineering contractor Three can undertake a single contract does not exceed five times the registered capital of the following projects:
1. Single pool volume of 300 cubic meters and below poultry, animal manure biogas project; single pool volume of 400 cubic meters and below anaerobic biochemical treatment project;
2. Single unit capacity of 200,000 kilowatts and below thermal power plant flue gas desulfurization project; 20 tons and below industrial and central heating coal-fired boiler flue gas desulphurization project;
3. Small-scale industrial projects of noise, harmful gases, dust, sewage, industrial waste comprehensive treatment works;
4. Grade A and below hospitals medical sewage treatment works.