Home
About
Profile
Culture
Service
Honor
Factory
Product Center
Pretreatment Equipment
Mixing & Dosing Equipment
Sludge-Water Separation Equipment
Oil (Residue)-Water Separator
Sludge Dewatering Equipment
Advanced Treatment Equipment
Flow Control & Conveyance Equipment
Retention Tank Equipment
Floating Debris Collector
Energy Dissipation Device
Blog
Company News
Industry News
Performance
Contact
Messages
Contact Us
Language
中文版
English
Cood faith Reputation is heavy . The unity ofknowledge and Practice
Guiyang Qingshan Wastewater Treatment Plant
Bridge-type sand suction machine (Guiyang Qingshan Wastewater Treatment Plant)
16
2018
/
08
Warmly celebrate the establishment of Tongji University internship base!
On the afternoon of February 18, 2017, Professor Yang Dianhai and his colleagues from the School of Environment and Engineering, Tongji University, visited our company and presented us with a plaque designating us as a "Tongji University Internship Base." Our Vice General Manager, Comrade Hou Tingquan, gave a speech at the awarding ceremony, warmly welcoming the teachers and students of Tongji University and expressing hope for collaboration to contribute to the rise of the enterprise. Professor Yang Dianhai also gave a speech, providing a detailed introduction to the history of Tongji University, the history of the School of Environment, its disciplines, research areas, new technologies, new equipment, and student employment performance. He pointed out that cooperation with our company could extend beyond undergraduate internships to include areas such as industry-academia-research collaboration.
20
2017
07
Photos from the May 4th Youth Day Extension Activities in 2017
09
05
Signing Ceremony for the Guizhou Puding Second Wastewater Treatment Plant BOT Project
On November 28, the BOT project for the second sewage treatment plant in Puding County, Anshun City, Guizhou Province was signed, and the project will be operated by the Guizhou Provincial Environmental Engineering Evaluation Center. The project covers an area of 70 mu and is expected to have a total investment of 125 million yuan. The project construction will be carried out in two phases, with a total scale of 40,000 tons per day. Among them, the first phase project has a scale of 10,000 tons per day and an estimated investment of 42.7 million yuan; the second phase expansion project has a scale of 30,000 tons per day and an estimated investment of 82.3 million yuan. The project will be operated in a BOT mode with a concession period of 29 years (including the construction period).
19
01
Xining plans to invest 120 million yuan to build a sewage treatment plant
Xining plans to invest 120 million yuan to build a fifth sewage treatment plant. The project is located in the planned new site of Shuangsubao Village on the east bank of Beichuan River in Xining City, with a total construction area of 4838 square meters. The design sewage treatment capacity is 30,000 tons per day in the near term (2015) and 45,000 tons per day in the long term (2020). Currently, the preliminary design of the project has passed the review.
A pollution control plan for the Fuxi River section in Zigong, Sichuan has been released.
The Fuxi River Basin is severely polluted and is a small watershed that the Sichuan Provincial Government has prioritized for remediation. On December 12, reporters learned from the Sichuan Provincial Environmental Protection Department that the "Fuxi River Basin (Zigong) Water Pollution Comprehensive Governance Implementation Plan (2012-2014)" was recently issued. It will adopt various measures to improve the water quality of the Fuxi River, including improving sewage treatment facilities, industrial pollution control, and agricultural non-point source pollution control, and strictly limiting the entry of high water-consuming industries. The Fuxi River Basin will comprehensively manage waste from medical, catering, accommodation, health, beauty, and farm stay businesses along the river, and strengthen riverbank garbage cleanup and the removal of floating objects on the river surface. By the end of 2013, the